- Replaced 1500 gal tank and 2 boilers with 18 NPE240’s. Racks and manifolds used.
- Bank of 8 and a bank of 10 for a three story stadium and training facility. Locker rooms with more than 40 showers, coach’s locker room, training room, weight room, and top floor skybox with kitchen and food service.
- Players and coaches previously complained of no hot water after game days. They have not had a complaint since.
- Funding is Very tight for this University and they did not trust our new technology. With a lot of help from Repnet, Navien, and a University Engineer we were able to persuade them to use our product.
- Navien units (tankless & boilers) are now being approved and used throughout other facilities and buildings on campus.